Enbloc were selected by the University to carry out the specialist deep clean to their new electronics cleanroom.
The deep clean scope included sterilisation of all cleanroom partitioned walls, ceilings and suspended flooring. Sterilisation of the University’s specialist equipment, complete sterilisation of the 1m deep underfloor void which housed various different specialist services including stainless steel pipework and electrical services for equipment.
The facility was completely vacuumed using a Cleanroom HEPA vacuum and then Enbloc engineers carried out their 4 step deep clean process, utilising Biocides, Triple Bucket mopping system, Low Particulate Wipes and Mop Heads, and IPA Alcohol sprays ensuring complete decontamination ready for final validation and handover for use.
Download this case study »Enbloc were selected as the Design and Build turnkey Contractor ›
Download case study »Enbloc were selected as the Design and Build turnkey specialist ›
Download case study »The facility comprised 4000m2 of Grade C/D areas, support areas, ›
Download case study »Royal United Hospital Bath NHS Foundation Trust’s new Aseptic Unit ›
Download case study »Enbloc are experienced in providing ISO5 to ISO8 facilities for ›
Download case study »As CBD products are now required to be manufactured under ›
Download case study »Enbloc are experienced in providing -40° degrees C dewpoint low ›
Download case study »Enbloc were chosen by the University Hospital Southampton NHS Foundation ›
Download case study »Enbloc are able to carry out the design, supply and ›
Download case study »Through innovative value engineering Enbloc successfully won the contract for ›
Download case study »Enbloc have been selected to design and build a significant ›
Download case study »Enbloc were chosen as Principal Contractor to provide a new ›
Download case study »Enbloc were contacted to provide a quotation for managing and ›
Download case study »Enbloc were contacted by the cleanrooms head of department to ›
Download case study »Enbloc designed and built the new Topical facility back in ›
Download case study »Enbloc were chosen as principal contractor to provide a full ›
Download case study »© 2024 Enbloc Ltd. All rights reserved | Enbloc Ltd, Registered Office: Unit 2, Pale Lane, Hook, Hampshire, RG27 8DH. Registered in England - Company No. 04079907