Our role:

Design and Build as Principle Contractor working direct for the NHS

Scope:

M&E + Construction + validation

Facility type:

Provision of Grade B CIVAS/Aseptic Suite

Floor area:

1000 m2

Contract value:

£2.5m

Programme:

12 months

A new Terminal Sterilisation(TSSU) suite for Cardiff and Vale NHS Trust. With 26 cleanrooms and dedicated change areas as well as further unclassified support areas the facility for Sterile and non Sterile manufacturing is an impressive unit. Multipurpose cleanrooms contain Isolators and Safety cabinets with the facility for freeze drying and two large Autoclaves.

Enbloc designed, installed and validated process gases, compressed air systems and process water services including an automatic WFI production plant and storage vessel, solution preparation system and bottle wash. The environmental monitoring system monitors temperature pressure and incorporates particle monitoring for the three Grade B rooms and Isolators.

Download this case study »