Enbloc were appointed to design and build of a major new facility direct for the NHS Airedale Trust. The project was a new Pharmacy Aseptic Unit to manufacture chemotherapy, Total Parenteral Nutrition (TPN), antibiotics and various intravenous drugs.
Enbloc delivered the Aseptic Suite, along with the toxic and non-toxic cytotoxic isolators, as a turnkey project. The Aseptic Unit was self contained and serviced by dedicated, air-handling plants to ensure segregation expected by the MHRA. HEPA (High Efficiency Particulate Air) filters fitted on the air supply and external ducted air extract were to the appropriate ISO 14644-1 Classification of Air Cleanliness Standard.
Enbloc’s Validation Department carried out the commissioning and validation to achieve the MHRA licence including the DQ, IQ and OQ and continue to have an ongoing maintenance contract.
Download this case study »Enbloc were selected as the Design and Build turnkey Contractor ›
Download case study »Enbloc were selected as the Design and Build turnkey specialist ›
Download case study »The facility comprised 4000m2 of Grade C/D areas, support areas, ›
Download case study »Royal United Hospital Bath NHS Foundation Trust’s new Aseptic Unit ›
Download case study »Enbloc are experienced in providing ISO5 to ISO8 facilities for ›
Download case study »As CBD products are now required to be manufactured under ›
Download case study »Enbloc are experienced in providing -40° degrees C dewpoint low ›
Download case study »Enbloc were chosen by the University Hospital Southampton NHS Foundation ›
Download case study »Enbloc are able to carry out the design, supply and ›
Download case study »Through innovative value engineering Enbloc successfully won the contract for ›
Download case study »Enbloc have been selected to design and build a significant ›
Download case study »Enbloc were chosen as Principal Contractor to provide a new ›
Download case study »Enbloc were contacted to provide a quotation for managing and ›
Download case study »Enbloc were contacted by the cleanrooms head of department to ›
Download case study »Enbloc were selected by the University to carry out the ›
Download case study »Enbloc designed and built the new Topical facility back in ›
Download case study »Enbloc were chosen as principal contractor to provide a full ›
Download case study »© 2024 Enbloc Ltd. All rights reserved | Enbloc Ltd, Registered Office: Unit 2, Pale Lane, Hook, Hampshire, RG27 8DH. Registered in England - Company No. 04079907