Enbloc were chosen as Principal Contractor to provide a new facility with modern and flexible cleanroom suites in a modular building at RMH Sutton. Enbloc provided Full design, construction and fit out to form new cleanroom laboratory suites together with Validation to achieve MHRA Licence.
The facility comprises: unclassified lobby and consumables store/quarantine area, separate Grade C personnel change rooms and materials airlock consisting of a common wiping-in area and separate in and out transfer hatches.
These lead into a common Grade C support area with ducted laminar airflow cabinets. This area feeds into the two Grade B Cleanrooms with ducted laminar flow cabinets providing a Grade A work environment.
The facility is finished in a fully welded vinyl finish to walls, floors and ceiling including full built in benches to minimise hard-to-clean areas.
Download this case study »Enbloc were selected as the Design and Build turnkey Contractor ›
Download case study »Enbloc were selected as the Design and Build turnkey specialist ›
Download case study »The facility comprised 4000m2 of Grade C/D areas, support areas, ›
Download case study »Royal United Hospital Bath NHS Foundation Trust’s new Aseptic Unit ›
Download case study »Enbloc are experienced in providing ISO5 to ISO8 facilities for ›
Download case study »As CBD products are now required to be manufactured under ›
Download case study »Enbloc are experienced in providing -40° degrees C dewpoint low ›
Download case study »Enbloc were chosen by the University Hospital Southampton NHS Foundation ›
Download case study »Enbloc are able to carry out the design, supply and ›
Download case study »Through innovative value engineering Enbloc successfully won the contract for ›
Download case study »Enbloc have been selected to design and build a significant ›
Download case study »Enbloc were contacted to provide a quotation for managing and ›
Download case study »Enbloc were contacted by the cleanrooms head of department to ›
Download case study »Enbloc were selected by the University to carry out the ›
Download case study »Enbloc designed and built the new Topical facility back in ›
Download case study »Enbloc were chosen as principal contractor to provide a full ›
Download case study »© 2024 Enbloc Ltd. All rights reserved | Enbloc Ltd, Registered Office: Unit 2, Pale Lane, Hook, Hampshire, RG27 8DH. Registered in England - Company No. 04079907