+44 01252 626229 Email Linked In

Case study

Cell and Gene Therapy

Key CGT unit in the UK, Enbloc carried out complete D&B fitout

The details

Our role:

Design & Build Specialist Contractor

Scope:

Full turnkey Fit-Out

Facility type:

MHRA licenced cleanroom suite

Floor area:

1500 m2

Contract value:

£5m

Programme:

18 months

Enbloc were selected as the Design and Build turnkey Contractor to provide the new Clinical Biotechnology Centre Expansion Facility at the NHS BT in Filton.

This new facility provides the Client with a new, modern, flexible, well designed facility including cleanroom suites and laboratories, change rooms and office working space which is linked to the current building at the NHS BT location in Bristol.

Enbloc completed the full design, build and fit out, in collaboration with the Client, to create controlled and classified clean containment rooms on the first floor with support laboratories and offices on the ground floor.

Enbloc continue working with NHS BT with an ongoing validation and maintenance contract for this site.

Download this case study »