Case study

Gene Cell Therapy Facility

Principal Design and Specialist Elements Build

The details

Our role:

Principal Design and Specialist Elements Build

Scope:

Design of Complete Project to RIBA Stage 3 and build of GMP areas

Facility type:

CGT GMP MHRA licenced facility

Floor area:

4000 m2

Contract value:

£5.6m

Programme:

8 months

The facility comprised 4000m2 of Grade C/D areas, support areas, controlled temperature storage, offices and warehousing.

Enbloc were chosen to do the complete design and specialist build of this new £100m GMP Cell and Gene Therapy facility which will be licenced by the MHRA. This design included all the elements as principal designers, including structural and civils works.

Design was completed in 3D using Revit and BIM360 to ensure coordination with the different members of the design team.

The Grade D/C cleanrooms are due to be built by Enbloc later in 2022 using a PAM construction method (Pre-assembled Modules). Each PAM cleanroom will have a dedicated off site assembled plantroom above preventing risk of cross contamination.