Enbloc designed and built the new Topical facility back in 2013, since then Enbloc have been carrying out the validation and maintenance to ensure continued cleanroom compliance and minimum down time due to HVAC issues.
6 monthly maintenance is carried out on the air handling unit, including; supply and changing of G4 pre-filters and F8 bag filters, f-gas checks on the associated condenser units and calibration of facility monitoring system.
6 monthly validation tests include; DOP filter integrity testing, HEPA filter changing, particle monitoring, temperature measurement differential measurement, supply volume and air change rate measurement and many more.
Enbloc are also completing the validation of the Microbiological Safety Cabinets, Fume Cupboards and Laminar Flow Cabinets.
Download this case study »Enbloc were selected as the Design and Build turnkey Contractor ›
Download case study »Enbloc were selected as the Design and Build turnkey specialist ›
Download case study »The facility comprised 4000m2 of Grade C/D areas, support areas, ›
Download case study »Royal United Hospital Bath NHS Foundation Trust’s new Aseptic Unit ›
Download case study »Enbloc are experienced in providing ISO5 to ISO8 facilities for ›
Download case study »As CBD products are now required to be manufactured under ›
Download case study »Enbloc are experienced in providing -40° degrees C dewpoint low ›
Download case study »Enbloc were chosen by the University Hospital Southampton NHS Foundation ›
Download case study »Enbloc are able to carry out the design, supply and ›
Download case study »Through innovative value engineering Enbloc successfully won the contract for ›
Download case study »Enbloc have been selected to design and build a significant ›
Download case study »Enbloc were chosen as Principal Contractor to provide a new ›
Download case study »Enbloc were contacted to provide a quotation for managing and ›
Download case study »Enbloc were contacted by the cleanrooms head of department to ›
Download case study »Enbloc were selected by the University to carry out the ›
Download case study »Enbloc were chosen as principal contractor to provide a full ›
Download case study »© 2024 Enbloc Ltd. All rights reserved | Enbloc Ltd, Registered Office: Unit 2, Pale Lane, Hook, Hampshire, RG27 8DH. Registered in England - Company No. 04079907