Wyeth research required their existing laboratory to be refitted to provide a GMP Grade B dispensing suite at their Gosportsite. The works were coordinated with Wyeth to ensure that their existing facility could maintain full functionality throughout the construction.
The new suite integrated downflowbooths into the construction of the room to provide a Grade B laminar flow zone, preceded by Grade C change room and material airlocks. Fast acting roller doors were installed to the material airlocks. The roller doors were custom made for this project with addition features designed by Enblocto ensure that a negative pressure was maintained at all times.
Key Points :
Enbloc were selected as the Design and Build turnkey Contractor ›
Download case study »Enbloc were selected as the Design and Build turnkey specialist ›
Download case study »The facility comprised 4000m2 of Grade C/D areas, support areas, ›
Download case study »Royal United Hospital Bath NHS Foundation Trust’s new Aseptic Unit ›
Download case study »Enbloc are experienced in providing ISO5 to ISO8 facilities for ›
Download case study »As CBD products are now required to be manufactured under ›
Download case study »Enbloc are experienced in providing -40° degrees C dewpoint low ›
Download case study »Enbloc were chosen by the University Hospital Southampton NHS Foundation ›
Download case study »Enbloc are able to carry out the design, supply and ›
Download case study »Through innovative value engineering Enbloc successfully won the contract for ›
Download case study »Enbloc have been selected to design and build a significant ›
Download case study »Enbloc were chosen as Principal Contractor to provide a new ›
Download case study »Enbloc were contacted to provide a quotation for managing and ›
Download case study »Enbloc were contacted by the cleanrooms head of department to ›
Download case study »Enbloc were selected by the University to carry out the ›
Download case study »Enbloc designed and built the new Topical facility back in ›
Download case study »Enbloc were chosen as principal contractor to provide a full ›
Download case study »© 2024 Enbloc Ltd. All rights reserved | Enbloc Ltd, Registered Office: Unit 2, Pale Lane, Hook, Hampshire, RG27 8DH. Registered in England - Company No. 04079907